USACE Carters Lake Operations Facility

01 Carters Lake Dam.jpg

USACE Carter's Lake Operations Facility

Ellijay, Georgia

2010 - 2011

Final: 
$463,350

CROFT provided full A/E design, fire protection, and construction administration services to support the construction of a 2,400 SF secure document storage facility and a 750 SF power house building addition for the USACE Mobile District.  Functional areas included a large dedicated secure storage space, work areas equipped with full data connectivity, restroom facilities, mechanical room, power generation support space designed to conform with both LEED Silver and AT/FP standards.

Deliverables included preliminary site assessment, cost estimate, specifications, constructability review to coordinate the integration of a steel-framed addition into an existing live generator facility, and construction administration including RFI and submittal review, shop drawing review/approval, construction monitoring, and inspections.


SERVICES PROVIDED

 
  • Architecture
  • Interior Design
  • Civil
  • Facility Assessment
  • Mechanical
  • Electrical
  • Plumbing
  • Fire Protection
  • Communications
  • AT/FP Measures
  • Design Analysis
  • Cost Estimating
 

TALK TO A TEAM MEMBER

Name *
Name